Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

Five-year plans

8 Probability of Union of Problem Union of Aoobazaliya Union / Future Program:

A five-year plan for the general public of Aoobazaliya Union was accepted as a challenge for managing the improved life system. The lack of adequate drinking water, lack of health and sanitation, lack of education, poverty, poor communication, lack of irrigation facilities, power supply, fisheries and livestock disease disorders and lack of training. Solving the problems described in the side, the poverty of the union will be resolved, the rate of education will increase, the health problems will be eliminated, the socio-economic condition will be improved, the crop production will increase, the communication system will develop, the development of fisheries and animal resources will be increased, the lack of drinking water will be eliminated, citizens will become illiterate The curse will be free.

If there is a paved road for communication, there will be trade opportunity. Repair and renovation of canal and repair of raw roads is important. It will be possible to develop business by establishing business and small industries in the future. Agricultural-non-agricultural land will be brought under irrigation and it will be possible to bring agricultural revolution.

Poor people, landless farmers, illiteracy, unemployment, power supply, sanitation, lack of employment etc. Besides, the disadvantage of raw roads in the rainy season. Cyclone flood and drought cause problem of livelihood and agricultural work. If the mentioned problems are eliminated, the union will become an ideal union.

Underdeveloped communication system, electrification, water logging, excavation of canal, sanitary latrines. Increasing marketing and agricultural production of easy-to-use agricultural products. Increase in the rate of education and the quality of education by going to school going children. Healthy environment and pollution-free social conditions will be created. In the monsoon season, uninterrupted land is planned under fish farming. Economic development through improved fodder and cow fattening project.

Water drainage and water logging. Lack of healthy latrines There is no proper drinking water facility, adequate deep tube well can not be installed. Lack of cottage industry Problems with the establishment of agricultural product based industries. Lack of agricultural product protection system Construction of clean pit water by establishing Kumarkhali Canal, Kumarkhali canal and other canals, supplying healthier latrines, providing clean drinking water, setting up of pure drinking water, establishing agriculture based industries, establishing cold storage for agricultural products and seeds, toilets in different populated areas